Commercial Doors in Dubai
Commercial glass doors, entrances, storefronts, partitions and back-of-house door systems for shops, restaurants, hotels, clinics, offices and warehouses. Commercial doors are chosen for how many times a day they open, how they behave in a fire strategy and how easily they can be serviced, not only for how they look.
Surveyed, quoted and installed by our own team · 10-year warranty on our aluminium systems

Commercial door systems we supply and install
A commercial door is judged on cycles, not looks. Most Dubai projects mix two or three of these commercial door systems in one building. These are the systems we fit most often in Dubai, and where each one belongs.
Automatic sliding entrances
Shop, showroom, clinic and hotel entrances with sensors, hold-open settings and a manual override for power cuts.
Commercial glass doors and storefronts
Toughened glass shopfronts with patch fittings or floor springs, sized around mall handover rules.
Commercial folding doors
Frontages that open completely in the cooler months. See commercial and industrial folding doors.
Sliding and telescopic systems
Wide openings where no panel may sit in the way. See telescopic sliding doors.
Office doors and partitions
Meeting rooms, private offices and booths. See office doors and office glass partitions.
Fire-rated doorsets
Certified assemblies where a compartment line runs. See fire-rated doors.
Pivot and feature entrances
Hotel, villa-style and showroom entrances where the door is part of the architecture. See pivot doors.
Industrial and back-of-house
Warehouse openings, service corridors and loading areas where durability and easy servicing come first.
What each sector actually needs
- Retail and malls: an open-feeling frontage, fast entry at peak hours, and compliance with the mall's fit-out manual, handover dates and working hours.
- Restaurants and cafés: frontages that open to a terrace in winter and seal against heat and dust in summer, plus separate, hard-wearing service doors.
- Hotels: lobby entrances with wind and dust control, function rooms that can be divided, and back-of-house doors that take trolley traffic.
- Offices: glazed meeting rooms with a sound target, access control at the main entrance, and doors that fit the ceiling and floor build-ups.
- Clinics and labs: wipeable, flush detailing with few ledges, and seals that hold a pressure difference where the brief calls for it. This is a specialist specification, so we quote it against the consultant's requirements.
- Warehouses and light industrial: wide spans, robust hardware, motorisation where the door is used constantly, and parts that can be replaced without shutting the bay for a week.
If several of these apply on one project, we split the schedule by door type so each opening gets the right system instead of one compromise.

How to specify a commercial door
Take this to your consultant, contractor or supplier. Anything left blank becomes someone else's decision later, usually on site.
| Decision | Why it matters |
|---|---|
| Openings per day | The single biggest factor in hardware grade. A residential-grade set on a shop entrance fails within a year. |
| Clear opening size | Trolleys, stock, wheelchairs and furniture all set a minimum; the structure sets the maximum. |
| Manual or automatic | Decides power, controls, sensors and what happens in a power cut. |
| Fire and escape role | Decided with the consultant before layouts are frozen, not at fit-out. |
| Sound target | State a figure for meeting rooms and hotel suites rather than "soundproof". |
| Security and access control | Locks, maglocks, readers and the fail-safe or fail-secure behaviour must be agreed together. |
| Glass specification | Toughened or laminated, solar control on sun-facing frontages, manifestation where required. |
| Finish | Powder-coated aluminium in the brand colour, matched across entrances, partitions and frames. |
| Servicing plan | Who maintains the door, how often, and where the parts come from. |
Fire, escape and approvals in Dubai
Escape doors are a separate decision
Escape routes need doors that open in a set direction, with a limited operating force and without special knowledge. Sliding, folding and revolving systems normally do not qualify, so the compliant escape doors have to exist elsewhere and be counted in the occupancy calculation.
Fire rating is a tested assembly
A fire-rated door is a certified set: leaf, frame, seals and hardware tested together. Swapping a handle or a closer for something uncertified can void the rating, so we supply fire doorsets complete. See fire-rated doors.
Requirements sit under the UAE Fire and Life Safety Code of Practice administered in Dubai by Civil Defence, alongside the Dubai Building Code. Malls and free zones such as DMCC, DIFC and JAFZA also run their own fit-out approval processes. The practical rule is simple: raise the doors at concept stage, because the escape strategy changes the floor plan, and the floor plan changes the doors.

Automatic entrances: what to plan before you buy
- Traffic pattern: steady flow suits sliding; occasional use may only need a swing door with a closer.
- Power and controls: a dedicated supply, the position of the control unit and an accessible isolator.
- Safety devices: presence and approach sensors set so the door never closes on a person or a trolley.
- Power failure: a manual break-out or override, agreed with the fire strategy.
- Air and dust: in summer, entrance doors decide how much hot, dusty air the air conditioning has to fight.
- Servicing: sensors and drives need an annual check; build it into the handover pack.
Fit-out programme: how a commercial door job runs
Survey and brief
We measure the openings, review the drawings and the fit-out rules, and agree the door schedule with you or your consultant.
Written proposal
System by opening, glass, hardware, finishes, compliance notes and the programme, all in writing before anything is ordered.
Approvals and coordination
Shop drawings for the fit-out approval where the building or authority requires them, coordinated with ceiling, flooring and MEP trades.
Manufacture
Standard aluminium systems are made in 2–3 weeks. Specialist and certified doorsets follow their own lead times, which we confirm in the proposal.
Installation and handover
Fitted around your trading hours and the building's rules, then tested, adjusted and handed over with the operating and maintenance information.
Occupied buildings: restricted working hours, booked service lifts and loading-bay slots are normal in Dubai towers and malls. We plan around them so the site is safe and usable at the end of each shift.
What drives the cost of commercial doors
Commercial doors are priced per opening, because two doors of the same size can be completely different products. Every project is quoted after a survey. These factors move the number:
| Factor | Effect |
|---|---|
| Duty rating of the hardware | Heavier-duty tracks, hinges and closers cost more and last far longer in daily use. |
| Automation | Operators, sensors, controls and commissioning are a significant part of an entrance budget. |
| Size and structure | Wide or tall openings need stronger sections and sometimes structural support. |
| Glass | Laminated, solar-control, acoustic or fire-rated glass all change the price. |
| Certification | Certified fire doorsets cost more than ordinary doors, because the whole assembly is tested. |
| Site conditions and hours | Night work, high floors and difficult access add labour and time. |
For a worked residential example of how a made-to-measure aluminium system is priced, see our aluminium bifold door prices. Commercial projects are quoted per opening after the survey.
Servicing and aftercare
Weekly
Tracks and thresholds cleared of sand and debris, daily on a busy food and beverage frontage.
Monthly
Rollers, hinges, closers and door checks inspected for wear and free movement.
Quarterly
Seals checked for sun damage, alignment verified, locks and access control tested.
Yearly
Full service, including fixings and, on automatic doors, the drive and safety sensors.
When something does go wrong, we repair and adjust glass and folding doors and sliding systems across Dubai. Day-to-day care is covered in our door maintenance guide.
Working with contractors and fit-out teams
We supply and install directly, so there is one team responsible for the survey, the manufacture, the fitting and the aftercare. Our systems use Schüco and AluK profiles with Roto, Siegenia or GU hardware, and our aluminium systems carry a 10-year warranty.
- Door schedules priced opening by opening, so nothing is hidden in a lump sum.
- Shop drawings for fit-out approval where the building or authority asks for them.
- Site coordination with ceiling, flooring, joinery and MEP trades.
- Snagging and handover documents, with adjustments after the building settles.
Finished projects are in our work, and the full list of what we do is under services.

Compliance, approvals and the rest of the commercial range
Commercial openings answer to more than the client. Escape routes, fire compartmentation and landlord fit-out rules all sit on top of the door specification.
- Build to the code, not to a brochure. Requirements for commercial openings, escape routes and glazing are set out in the Dubai Building Code published by Dubai Municipality, and mall or building management will have its own fit-out manual on top. We work to whichever is stricter.
- Fire-rated openings need certified doorsets with test evidence supplied, and approval is granted to the building rather than to a supplier — see fire-rated doors in Dubai.
- Offices and meeting rooms — acoustic, glazed and partition-matched sets are covered on office doors in Dubai and glass partition systems.
- Folding shopfronts and servery openings — see aluminium folding doors, internal folding doors and, for light internal separation only, PVC folding doors.
- Wide clear openings for showrooms and atria — see multi-slide telescopic doors and ultra-slim sliding doors.
- Maintenance contracts and call-outs — see glass door repair and sliding door repair in Dubai.
Commercial doors Dubai: FAQs
What counts as a commercial door?
Any door specified for a business rather than a home: shop and showroom entrances, restaurant frontages, hotel lobbies, office and meeting-room doors, clinic doors and warehouse openings. The difference is the duty rating, the compliance role and the servicing plan, not just the size.
How are commercial doors different from residential ones?
They open far more often, so the hardware is rated for repeated daily use and the parts are made to be replaced. They also have to fit the building's fire and escape strategy, and they are normally maintained under a schedule rather than by the owner.
Can a sliding or folding door be a fire exit?
Generally no. Escape doors must open in a set direction, with a limited operating force and without special knowledge. A commercial space with a sliding or folding frontage still needs compliant escape doors elsewhere, counted in the occupancy calculation.
Do you supply fire-rated doors?
Yes, as certified doorsets where a fire compartment line runs. The leaf, frame, seals and hardware are tested together, so we supply the complete set rather than fitting uncertified parts to a rated door.
Do you install automatic entrance doors?
Yes. We plan the power supply, sensor positions, controls and the manual override for power failure, then commission and test the door before handover.
How much do commercial doors cost in Dubai?
They are quoted per opening after a survey, because the duty rating, automation, size, glass and any certification change the price completely. We price the door schedule opening by opening so nothing is hidden in a lump sum.
How long does a commercial door project take?
Standard aluminium systems are made in 2-3 weeks after approval; certified and specialist doorsets follow their own lead times. Installation depends on the number of openings and the hours the building allows, and the programme is confirmed in the written proposal.
Can you work around our trading hours?
Yes. Fit-outs in occupied malls, towers and restaurants are normal for us. We work to the building's permitted hours, book the service lift and leave the site safe and usable at the end of each shift.
Do you work with contractors and consultants?
Yes. We price from door schedules and drawings, provide shop drawings for fit-out approval where they are required, and coordinate on site with the ceiling, flooring, joinery and MEP trades.
What approvals are needed for commercial doors in Dubai?
Usually building management approval of the fit-out drawings, plus Dubai Municipality and Civil Defence requirements where the work affects layout, fire compartmentation or escape routes. Malls and free zones run their own fit-out permits.
Do you service and repair commercial doors?
Yes. We service the doors we install and repair sliding, folding and glass door systems across Dubai, including rollers, closers, seals, locks and automatic door sensors.
Do you cover other emirates?
Yes. We work across the UAE, including Abu Dhabi, Sharjah, Ajman and Ras Al Khaimah.
Talk to us about your commercial door project
Send the drawings, the door schedule or a few photos on WhatsApp. We will survey the openings and quote the right system for each one.
Al Qusais Industrial First, Dubai · Mon–Sat 8:00–19:00 · contact@dreamfold.ae