Door Installation in Dubai
Bifold, sliding, pivot, glass and internal doors measured, supplied and installed by our own fitters across Dubai and the UAE. No subcontractors, no guesswork: we survey the opening first, put the specification in writing, and fit the door level, sealed and tested.
Free site visit · 10-year warranty on our aluminium door systems

Door installation services we provide in Dubai
Most door problems in Dubai start with the fit, not the door. A frame that is out of level, a threshold with no drainage or a track that was never packed properly will make even a good door drag within a season. Every installation below is done by our own fitters.
Bifold door installation
Track levelled, panels hung and adjusted until each joint is even. See aluminium bifold doors.
Sliding door installation
Heavy panels set on packed, level tracks with drained thresholds. See sliding doors and ultra-slim systems.
Pivot and entrance doors
Pivot sets aligned to the floor and structure so a heavy leaf swings with one finger. See pivot doors.
Glass doors and partitions
Toughened glass, patch fittings and floor springs, plus glass partition installation for offices.
Internal and room doors
Bedroom, bathroom, wardrobe and folding room dividers, fitted to existing openings. See internal folding doors.
Shopfronts and offices
Fit-out work booked around building rules and trading hours. See commercial doors.
Garage and wide openings
Motorised and vertical systems set out with the structure checked first. See bifold garage doors.
Replacement doors
Old frame removed, opening made good and the new door fitted the same visit where the structure allows.
Repair, not replacement? If the door itself is sound and only drags, leaks or won't lock, see glass and folding door repair or sliding door repair. It is usually an adjustment, not a new door.
Automatic and motorised door installation
Automatic doors need more than fitting: they need a power supply, controls and safety devices that are commissioned and tested before handover.
Where they suit
Shop and showroom entrances, hotel and clinic lobbies, wide villa openings and garage doors that are used several times a day.
What we plan first
The supply point, the swept or stacked area, sensor positions and what happens in a power cut, because a manual override is normally required.
Commissioning
Opening speed, hold-open time and safety sensors are set and tested with you, then the operation is demonstrated at handover.
For motorised folding systems see our automatic bifold garage doors, and for entrance systems in shops, offices and hotels see commercial doors.
Door fitting, replacement or repair: which one do you need?
| Situation | What you need | Where to go next |
|---|---|---|
| New villa, extension or fit-out | Door fitting from scratch: survey, make to measure, install | Book a free site visit below |
| Old door still works but looks dated, or you want more glass | Door replacement: old frame out, new system in | Door buying guide |
| Door drags, rattles, leaks or will not lock | Adjustment or repair, not a new door | Glass and folding door repair |
| Rollers, seals or handles worn after years of sand | Parts replaced and the door re-adjusted | Sliding door repair |
If you are not sure which one applies, send a short video of the door on WhatsApp. Our fitters can usually tell from how the panels move whether it is a fixing job or a replacement.
How our door installation works, step by step
Free site visit and measurement
We measure the opening at several points, check the floor level, the structure above, the exposure and the access route, and talk through the options for the room.
Written quote
System, glass, hardware, finish, opening sizes, dates and the installation scope are set out in writing. You approve before anything is ordered.
Manufacture
Standard aluminium systems are made to your exact measurements in 2–3 weeks. We confirm the fitting date as the door is finished.
Installation day
We protect the floor and route, remove the old door where needed, set and level the frame, hang the panels, seal the perimeter and clear up.
Adjust, test and hand over
Every panel is adjusted, the locks and seals tested, and you are shown how to operate and care for the door before we leave.

What we check at the site survey
The survey is where a good installation is won. These are the points our fitters measure and photograph before anything is ordered.
| Check | Why it matters |
|---|---|
| Opening width and height, at three points | Walls and floors are rarely square; the door is made to the tightest dimension. |
| Floor level along the track | A dip under a sliding or bifold track makes panels drag and seals leak. |
| Structure above the opening | Heavy glass needs a lintel or head that will not deflect onto the door. |
| Threshold and drainage | Any exposed elevation needs drained tracks so rain runs out, not in. |
| Exposure and orientation | Sun and wind decide the glass spec and, on high floors, the system. |
| Access route | Lift size, corridor turns and balcony access decide panel sizes and the fitting method. |
| Power and controls | Motorised doors need a supply point and a plan for power cuts. |
| Building rules | Towers and communities often need approval for façade or balcony changes before work starts. |
How to prepare for installation day
Clear the opening
Move furniture, curtains and blinds about two metres back on both sides so the fitters can work safely.
Book the access
In towers, book the service lift and inform security in advance. Tell us the working hours your building allows.
Floors and finishes
If tiling or flooring is still to be laid, tell us at the survey: the threshold height depends on the finished floor.
Someone on site
Someone who can approve the handle height, opening direction and the final position should be there at the start.
How long does door installation take?
| Stage | Typical time |
|---|---|
| Site visit and written quote | The visit takes under an hour; the quote follows it. |
| Manufacture of standard aluminium systems | 2–3 weeks |
| Fitting a standard opening | 1–2 days |
| Large, multiple or motorised openings | Longer; we confirm the programme in the quote |
| Occupied towers, malls and offices | Allow more time: restricted hours, booked lifts and loading slots |
Internal doors and straightforward replacements are usually quicker than external glazed systems, because there is no structural or weather detail to resolve.
What affects the cost of door installation in Dubai
Installation is normally quoted with the door, so the honest answer is that the opening decides the price. These are the factors that move it, and every project is quoted after a free site visit.
| Factor | Effect on the price |
|---|---|
| Door type and size | A wide glazed bifold or sliding run takes more hands and more time than an internal door. |
| Removing the old door | Stripping out a frame and making the opening good is extra labour. |
| Opening condition | Uneven floors, weak lintels and out-of-square walls need correcting first. |
| Access | High floors, tight lifts and crane or rope access on large panels add cost. |
| Motorisation | Power supply, controls and safety sensors add materials and commissioning time. |
| Working hours | Night or weekend work in occupied buildings takes longer and costs more. |
For a worked example with real figures, see our aluminium bifold door prices, which are quoted supplied and installed from AED 2,500 per panel.

Difficult openings we deal with often
- Out-of-square openings in older villas: measured at several points and packed and sealed so the gaps stay even.
- Existing marble or tiled floors: flush thresholds are set out so the finished floor and drainage still work.
- High-floor apartments: panel sizes planned around the lift, and balcony glazing checked against wind exposure and building approval.
- Wide openings with no support: the structure above is checked, and where it is not strong enough we say so before you order.
- Occupied homes and shops: the opening is made weathertight the same day wherever the programme allows.
If an opening is not suitable for the door you have in mind, we tell you at the survey and suggest the system that will work. See our door buying guide for how the systems compare.
Warranty, handover and aftercare
10-year warranty
Our aluminium door systems carry a 10-year warranty. The written quote states exactly what is covered.
Handover
We test every lock, seal and panel with you, and show you how to operate and clean the door.
Adjustments and service
Doors settle. If a panel needs adjusting later, we come back and adjust it. See the maintenance guide.
Finished projects across Dubai are in our work, and the systems themselves are listed under our services.
Where we install doors
We install across Dubai and the wider UAE, in villas, apartments, offices and shops.
- Dubai: Downtown, Dubai Marina, Palm Jumeirah, Jumeirah and Umm Suqeim, Arabian Ranches, Emirates Hills, Dubai Hills, Business Bay, JVC, Mirdif, Al Barsha and Deira.
- Other emirates: Abu Dhabi, Sharjah, Ajman and Ras Al Khaimah.
- Workshop: Al Qusais Industrial First, Dubai, open Monday to Saturday, 8:00–19:00.
Approvals, rules and related reading
Two things decide whether a door installation goes smoothly in Dubai: getting the opening right, and getting permission right. The second one catches more people out than the first.
- Check the building rules before you order. Where an installation alters an external opening, changes a lintel or touches the facade, the requirements are set out in the Dubai Building Code published by Dubai Municipality. In an apartment or a managed community, the developer or owners association will have its own approval process on top of that. We raise both at the survey rather than after fabrication.
- Entrance doorsets carry security and structural requirements of their own — see villa entrance doors in Dubai.
- Fire-rated openings need certified doorsets with test evidence, not just a heavier leaf — see fire-rated doors in Dubai.
- Bedroom and interior fit-outs are usually simpler, with no weather or wind performance to pay for — see bedroom doors and wardrobe doors in Dubai.
- Working out a budget first? Our guide to sliding glass door installation cost in Dubai explains what sits inside an installed price and what quotations usually leave out.
Door installation Dubai: FAQs
How much does door installation cost in Dubai?
Installation is normally quoted together with the door, so the price depends on the door type, the size of the opening, whether an old door has to be removed and how easy the access is. Every project is quoted after a free site visit. As a reference, our aluminium bifold doors are supplied and installed from AED 2,500 per panel.
How long does it take to install a door?
A standard opening takes 1-2 days to fit. Before that, standard aluminium systems take 2-3 weeks to make. Large, multiple or motorised openings take longer, and we confirm the programme in the written quote.
Do you remove the old door?
Yes. We strip out the old door and frame, make the opening good and fit the new door. Tell us at the survey so the removal is included in the quote.
Do you install doors bought somewhere else?
We install the systems we supply, because the warranty then covers the door and the fitting together. If you already have a door, send a photo and the details on WhatsApp and we will tell you honestly whether we can help.
What do you need from me before installation day?
A clear opening with furniture moved back, access booked in the building, and someone on site at the start who can confirm the handle height and opening direction. If the floor finish is not laid yet, tell us at the survey.
Do I need building approval for a new door?
Inside a villa, usually not. Changing a facade, enclosing a balcony or altering a shopfront usually needs building management, developer or authority approval. We tell you what applies at the site visit.
Can you install doors in an occupied apartment or shop?
Yes. We work around the building's permitted hours, book the service lift and, wherever the programme allows, leave the opening weathertight at the end of each day.
Is there a warranty on the installation?
Our aluminium door systems carry a 10-year warranty, and the written quote sets out what is covered. Doors settle after fitting, so if a panel needs adjusting we come back and adjust it.
Do you install doors outside Dubai?
Yes. We install across the UAE, including Abu Dhabi, Sharjah, Ajman and Ras Al Khaimah.
What is the difference between installing a bifold and a sliding door?
A bifold needs every panel hung and adjusted so the folded stack sits evenly, while a sliding door needs a perfectly packed, level track to carry heavy panels. Both need a drained threshold on any exposed elevation.
Can you replace a door in one visit?
Straightforward like-for-like replacements are usually done in one visit once the new door has been made. The manufacturing time comes first, which is why the survey happens before anything is ordered.
What if my opening is not square?
That is normal in older buildings. We measure at several points, make the door to the tightest dimension, then pack and seal the frame so the gaps stay even and the door still runs smoothly.
Book your free site visit
Send the opening size or a photo on WhatsApp. We will visit, measure, and put the door, the glass and the installation in writing.
Al Qusais Industrial First, Dubai · Mon–Sat 8:00–19:00 · contact@dreamfold.ae